4-Hour Agenda (Dec 15 — live webinar)

Total time = 240 minutes (4 hours). Breaks are distributed between blocks.

10:00
Welcome, outcomes & orientation
10 min
10:10
Module 1 — Why Modular (business case + project selection)
30 min — How up-front modularization drives 50–80% schedule improvements and quick project-fit screening.
10:40
Module 2 — Design & Engineering (DfMMA + Digital Twin)
40 min — Modular design team, DfMMA principles, BIM and digital twin workflows that reduce errors and support factory production.
11:20
Module 3 — Manufacturing (factory realities)
35 min — Manufacturer selection, QA/certification and manufacturing schedule considerations.
11:55
Module 4 — Off to the Site & Site Work (logistics + civil)
40 min — Transport & setting, coordinating foundations with factory timelines, and reduced on-site scope for modular projects.
12:35
Module 5 — Completion, Handover & Financing
40 min — Inspection packs, certification, handover checklists and financing realities. Includes an introduction to Fast Track Permitting.
13:15
Case Study — Project walkthrough
25 min — Walkthrough from concept to occupancy.
13:40
Live Q&A, next steps & conversion pathway
20 min

Materials included

  • PDF handbook (summary + checklist + templates)
  • Sample inspector/permit set and manufacturing evaluation scorecard
  • Recommended reading and links
DfMMA, BIM & Digital Twin icon panel
DfMMA, BIM & Digital Twin
Project timeline from design through factory production to handover
Factory → Site timeline
Case study snapshot
Case study snapshot